New construction on a Sandy Springs teardown lot needs cabinets ordered from the plan set, before the demolition permit drives the schedule.

Get my free estimate >>

Free estimate from a local cabinet pro. No obligation.

Get my free estimate

Free estimate from a local cabinet pro. No obligation.

By submitting you agree to be contacted about your project.

Or call (470) 516-9254. Calls only, we do not receive text messages.

White raised-panel cabinets just installed in a new kitchen, a level and drill on the bare island top.
Call (470) 516-9254

Answered 24/7

A custom builder on a Sandy Springs teardown lot runs into a sequencing problem that suburban tract work rarely creates: the demolition permit drives the rebuild schedule, and builder cabinet packages in Sandy Springs, GA have to land inside a window that opens only after pest control clearance and an asbestos abatement survey are filed. For builder Cabinet Packages in Sandy Springs, ask the selected provider to confirm whether this work or service is offered and identify what is included in the written scope.

  • Free estimate from a local pro
  • No obligation to go ahead
  • Semi-custom to full custom

About our new construction builder cabinet packages

The infill lots around Chastain Park and Meadowbrook tend to run narrower than a standard suburban footprint, which means the kitchen often draws long and single run instead of square. That shape affects every box size, every pull, and the appliance placement. Calling Sandy Springs Cabinet Co early, before framing is complete, puts the cabinet layout in the plan set while changes cost nothing, and it puts a free estimate in hand before the contractor contingency is spent.

Builder cabinet packages Sandy Springs

Cabinets ordered from the plan set before the slab is poured

A new construction kitchen on a teardown lot has a fixed cabinet schedule driven by the permit, not the owner's preference. Sending the architectural drawings at plan review stage lets the cabinet order get into production while the demolition, pest control clearance, and asbestos abatement survey run in parallel. That sequencing is what keeps the cabinet install off the critical path at Certificate of Completion.

  • Ordering from the architectural plan set avoids the field-measure delay after framing is up
  • Production starts while demolition and abatement run, so cabinets arrive when framing is ready
  • So the Certificate of Completion inspection is not held up by a late cabinet delivery
  • Ask at the free estimate when the order needs to be placed relative to your permit date
Get my free estimate >>

Free estimate from a local cabinet pro. No obligation.

Call (470) 516-9254

Answered 24/7

Sandy Springs new construction kitchen layout

Long narrow infill lots call for a different kitchen shape

Teardown lots in Sandy Springs are rarely square. A long and narrow footprint pushes kitchen layouts toward a single-wall or galley run rather than an L or U, and that shape changes the box count, the island clearance calculation, and the mechanical rough-in locations. Getting the layout question answered before the slab is poured is the difference between a kitchen that works and one that the architect has to revise.

  • Narrow infill lots favor galley or single-wall layouts that a square-lot estimate does not cover
  • Island clearance on a narrow lot is a proportion question that needs the actual dimensions, not a standard allowance
  • So rough-in locations are set correctly before the slab is poured, not revised after
  • A free estimate from a local cabinet pro prices the layout that actually fits the lot
Get my free estimate >>

Free estimate from a local cabinet pro. No obligation.

Call (470) 516-9254

Answered 24/7

New construction cabinet estimate Sandy Springs

What a new construction bid includes that a remodel quote leaves out

A new construction cabinet estimate covers the full plan-set review, the box spec matched to the architectural drawings, and the install sequence tied to the permit schedule. Items like crown to the ceiling, filler panels at walls that are not plumb, and hardware are the extras that a builder-grade quote leaves as owner allowances. Ask that everything be listed so the number you approve is the number on the invoice.

  • Plan-set review is included so the box count matches the drawings, not a field estimate
  • Crown, filler panels, and hardware are listed separately so you can see where the number comes from
  • So you compare two bids on the same scope, not a stripped version against a fully loaded one
  • Ask whether delivery to the lot, including access coordination, is in the price
Get my free estimate >>

Free estimate from a local cabinet pro. No obligation.

Call (470) 516-9254

Answered 24/7

Why Sandy Springs Cabinet Co

How to plan your project

Tell us about the room and a local cabinet pro gives you a free estimate, with no obligation to go ahead.

FreeAn estimate from a local cabinet pro, with no obligation
Line by lineAsk for every cabinet to be listed in the estimate, so changes stay simple
4 to 16 wksTypical lead time, semi-custom to custom; ask for yours at the estimate
LevelledBoxes shimmed, scribed and checked before the doors go on
Get my free estimate >>

Free estimate from a local cabinet pro. No obligation.

Call (470) 516-9254

Answered 24/7

Demolition paperwork that sets the kitchen date

A full residential demolition permit in Sandy Springs requires two documents that go beyond a standard teardown application: a certified pest control inspection letter and a written asbestos abatement survey of the existing structure. Sandy Springs Community Development requires both before the demolition permit is issued. Until those two clearances are in hand and the permit is open, no interior demolition calendar exists, and without a demolition calendar, no cabinet order can be placed against a confirmed delivery window.

The pest control letter must come from a licensed operator and certify that the structure is free of active termite and wood-destroying organism infestation, or that any infestation present has been treated. The asbestos survey requires a certified inspector to sample suspect materials in the existing structure: floor tile, joint compound, pipe insulation, roofing material, textured ceilings. A positive result triggers an abatement contract and a separate abatement sign-off before the demo permit moves forward.

The practical consequence for a cabinet order: the earliest date to place a semi-custom order is the day the demo permit is issued, because that is the first date with a known construction start. Request a scope-based schedule for builder Cabinet Packages in Sandy Springs, including countertop work, service connections and any return visits rather than assuming a standard duration. A custom line runs roughly eight to sixteen weeks. A builder who places the cabinet order before the demo permit clears is placing it against an estimated start date rather than a confirmed one, which means the delivery may arrive before the slab is poured, and every week the materials sit on an open construction site adds handling risk.

Rebuild kitchen cost from the plan set

A new construction kitchen in Sandy Springs prices from the plan set, not from a field measure of an existing layout. The architect's floor plan shows the kitchen footprint in nominal dimensions, but the cabinet box list has to be drawn from finished dimensions: framing to finished wall, finished floor height, ceiling height, and rough-in locations for plumbing, gas and electrical. Any discrepancy between the plan set and the framed walls can move the cost, which is why confirming the drawings against the framed walls before the order is placed is part of the process.

Cabinet grade is the largest driver. For builder Cabinet Packages in Sandy Springs, request an itemized quote showing box sizes, door and drawer choices, fittings, finish and installation scope rather than relying on a general price range. Ask how the quoted builder Cabinet Packages in Sandy Springs option changes with cabinet construction, drawer count, specialty fittings and site preparation; confirm which materials and work are actually included.

Choices that move the cost within a grade: door style (slab versus shaker versus raised panel versus inset), box material (plywood construction versus particleboard), drawer bases versus door bases of the same width, tall pantry boxes and range hood cabinets, painted maple versus stained white oak or rift-sawn oak, and hardware. Soft-close hinges and undermount slides are standard on most semi-custom and custom lines and are specified at order, not added later.

Countertop work is a separate line item, templated after the boxes are set plumb and level. Wall prep and any plumbing rough-in adjustments are also separate. The figures above are estimates for builder cabinet package in sandysprings, subject to change, and the written quote sets the final price.

Narrow infill lots and the long kitchen

The infill lots along the streets running off Roswell Road toward Chastain Park, and the blocks east of Meadowbrook subdivision, often run narrower than the standard suburban lots a few miles north. A teardown site in Sandy Springs may be sixty feet wide where a comparable lot in a newer development runs eighty or more. The kitchen on a narrow infill lot rarely accommodates a square U shape or a full center island. The practical layout is a long single-run on the exterior wall, sometimes with a peninsula rather than a full island, and the refrigerator at the end of the run rather than in a corner return.

A long single-run layout affects every cabinet spec. The total linear footage may be comparable to a U kitchen in a wider house, but the boxes are sized in a continuous sequence rather than split across two opposing walls, which changes where corner solutions are needed. A long single-run kitchen has no corner base, so there is no Lazy Susan, no blind corner pull-out, and no corner wall unit to spec. The run length also determines whether a tall pantry or a range hood cabinet fits at the end of the run or has to be sized into the middle of the sequence.

Narrow infill lots also affect framing and window placement in ways that carry through to the box list. A kitchen window centered on a narrow exterior wall may leave less room above it for wall cabinet height than a standard plan assumes. Drawing the box list from the architectural elevations, not just the floor plan, is how those conflicts surface before the order is placed and before walls are closed.

Grey shaker apartment kitchen with a white quartz counter and stainless range, cardboard boxes stacked beyond the doorway.

Agreeing inspection and handover dependencies

For a Sandy Springs builder package, ask the reviewing authority which approvals and inspections apply to the actual building permit. Confirm whether cabinetry affects the project’s closing requirements and which documents are needed at completion. Use the authority’s current terminology and process rather than assuming that every residential project closes with the same certificate or that every cabinet installation is inspected in the same way.

Have the builder, cabinet installer and relevant trades agree on the sequence before assigning delivery dates. Identify which wall, floor and utility work must be ready for installation and which items must remain accessible for inspection. If an approval or site condition is outstanding, record that dependency in the programme. Keep the homeowner informed about provisional dates rather than presenting an inspection result or closing date as guaranteed.

For the installation itself, ask the provider to describe how the chosen cabinet system will be supported, aligned and adjusted. Check the layout against the finished site dimensions and arrange any necessary professional assessment before fixing boxes. Coordinate countertop measurement with the fabricator after the installation is ready for that step. Record incomplete work and agreed remedies at handover, and ask the authority which final submissions or visits remain before treating the overall project as closed.

Shrink-wrapped cabinet boxes stacked on wood pallets on a warehouse floor beside a red hand truck.

The process

From first call to installed cabinets

Four steps, and you make a decision at the end of each one before the next begins.

  1. Call or send the form

    Tell us about the room and what you want from it, and a local cabinet pro contacts you to talk it through.

  2. Free estimate

    A free estimate for the room, with door style, finish and hardware choices to weigh before you commit.

  3. Decide, then order

    Ask for every cabinet and the lead time to be listed in writing. Nothing is ordered until you decide to go ahead.

  4. Delivery and install

    Boxes are checked on arrival, set level and scribed to the walls, doors adjusted, then a walk-through with you.

Get my free estimate >>

Free estimate from a local cabinet pro. No obligation.

Call (470) 516-9254

Answered 24/7

More cabinet options

Grey shaker apartment kitchen with a white quartz counter and stainless range, cardboard boxes stacked beyond the doorway.Long corridor of a new apartment building with open unit doors, grey cabinets visible in the nearest kitchen.Shrink-wrapped cabinet boxes stacked on wood pallets on a warehouse floor beside a red hand truck.

Questions

New Construction Builder Cabinet Packages: Common Questions

When in the project should I send you the plan set?

Before framing is complete. A plan set in hand before walls close lets the box list be drawn from the architectural dimensions, and any conflict between rough-in locations and the cabinet sequence can be resolved while changes cost nothing. After framing, on-site verification is still possible, but the earlier the plan set arrives, the earlier the lead time can start and the earlier the delivery date can be set into the construction schedule.

Do you work from architectural drawings for a new construction kitchen?

Yes. The cabinet box list for a new build starts from the plan set's floor plan and kitchen elevations. The architectural dimensions set the box sizes and the appliance placement. After framing, confirming the drawings against the framed walls before the order is placed matters, because framing rarely matches drawings to the quarter inch, and even a small discrepancy in a long single-run kitchen can affect the box count.

What is the lead time for a new construction cabinet order?

For the Sandy Springs builder order, request a current supplier production estimate and identify delivery, site readiness and installation as separate stages. Ask the responsible office which approvals must precede the planned work. Record the dependencies and provisional dates in the construction schedule rather than using a standard custom-cabinet window.

Does a long single-run kitchen on a narrow infill lot cost differently than an L or U layout?

The linear footage drives the cost, not the shape. A thirty-foot single-run kitchen prices similarly to an L kitchen with fifteen feet per wall at the same grade, if the specialty unit count is comparable. The difference shows in the corner treatment: an L or U kitchen uses corner base solutions such as a Lazy Susan, which a single-run kitchen does not need. That changes the box mix but does not change the cost per linear foot.

Does the cabinet install need to be complete before the Certificate of Completion inspection?

Ask the Sandy Springs reviewing authority which completion steps and inspections apply to the building permit and whether the proposed cabinet work affects them. Coordinate the installation and any required visits with the builder and trades. Obtain the authority’s requirements before assuming unfinished cabinetry either prevents or permits the project’s close.

What should the estimate for a new construction project include?

A new construction estimate lists every box by size and type, the door style, finish and hardware selection, and the confirmed lead time for the line ordered. Countertop work and any wall prep are listed as separate line items. The estimate sets the final price: no cost is added after the estimate is agreed without a written change order.

Free estimate

Talk to us about new construction builder cabinet packages

Tell us about the room, in Sandy Springs or anywhere in the service area, and a local cabinet pro gives you a free estimate, with no obligation.